|
Lesotho Highlands Water - Consulting Services for The Feasibility Study for
Phase II
Main Report
Taung Dam Water utilization Feasibility Study
Demographics
Water Demand and Use
Yield & System Analysis
Groundwater Resources
Irrigation Planning & Design
Water Development Supply Plans
Water Quality Status Overview Modelling
Existing and Proposed Infrastructure
Conveyance System Scenarios Economical Analysis
Regional and National Economy
EIA and Public Participation
Main Report
Pre-Feasibility Study Info - Final Reports
LORM Final Reports
Dam Development Options and Economic Analysis
Volume 1
Volume 2
Environment Assessment
Estuary Report
Hydrology Water Quality and Systems Analysis Volume A
Hydrology Water Quality and Systems Analysis Volume B
Inception Report
Legal Water and Cost Sharing
Main Report
Public Consultation
Riverine Report
Vioolsdrif Noordoewer JIA
Water Conservation and Demand Management
Water Requirements
Scanned Signature Pages
Orange River System AOA
|