|
|
| Documents :
Other |
| Proposal
for the establishment a Catchment Management Agency for the Usutu
to Mhlathuze Water Management Area [PDF] |
- Final Proposal
document, September 2004
[1.3MB]
- Appendix A: Situational Assessment, September 2004
- Part 1: Introduction,
Background, Institutional Arrangements, Demographics and Socio-economic
Profile [1.3MB]
- Part 2: Catchment
Characteristics [1.2MB]
- Part 3: Hydrology
[427KB]
- Part 4: Water Resources
Infrastructure and Management, Existing Permits and Registration,
Water Use, Water Quality, Cost Recovery, Conclusions, References
[1.3MB]
- Appendix B: Financial
Feasibility Study, September 2004 [444KB]
- Appendix C: Stakeholder
Participation Process, September 2004 542KB]
|
|
|